RUBATEC, action for ATL in Santa Perpètua de Mogoda

  

RUBATEC, awarded a contract to install flowmeters to pipes in the drinking water network managed by ATL, installs a DN1000mm flowmeter in less than 24 hours in the Riera de Caldes of Sta. Perpetua de Mogoda. This is placed in a concrete pipe with a sheet metal jacket, having to cut and remove a section 12m long at a depth of 9m. The section is located at the entrance to a drinking water supply reservoir for Sta. Perpetua de Mogoda and has a volume to last approximately 24 hours without having to cut the supply.  (+info)


Escribir comentario

Comentarios: 0