< Back to Business areas
Water
Instalación de la Edar Mas Pins en Sant Cugat
Operation, maintenance and improvement of the Edars Ribera sanitation system 2022-2025
Operation, maintenance and improvement of the Edars Terra Alta sanitation system 2022-2025
Operation, maintenance and improvement of the sanitation system Edars Priorat 2022-2025
Extension of the sludge dehydration at the WWTP of Mataró
Thermal drying at the WWTP of Montornès del Vallès
Construction of a grounwater collection network at Montjuïc mountain in Barcelona
Construction and operation of the WWTP of Jorba
Construction and operation of the WWTP of Horta de Sant Joan
Construction, maintenance and operation of the WWTP of Prades
Construction, maintenance and operation of the WWTP of Vendrell
Construction, maintenance and operation of the WWTP of Perelada
Construction, maintenance and operation of the WWTPs of Tremp i Vilamitjana
Construction, maintenance and operation of the WWTPs of Ribera d’Ebre
Construction, maintenance and operation of the WWTPs of Terra Alta
Construction, maintenance and operation of the WWTPs of Pallars
Construction of rainwater collectors in Segur de Calafell
Reform of the water system from Girona - Costa Brava Airport
Rehablitation of Parc de la Pegaso’s Lake in Sant Andreu’s District
Maintenance of installations at ETAP Ter
Reform of the pretreatment of the WWTP of Teià
Construction of the tertiary treatment of the WWTP Vendrell